Education Building renovations at West Texas A&M show the problem a school builder faces in the Panhandle: the money is approved for one date and the students arrive on another. The Texas A&M University System regents approved $45 million in November 2022 for renovation of that building and health and safety upgrades across the Canyon campus, and work like that has to fit between semesters, around labs and classrooms that keep running.

We build and renovate elementary, middle and high schools, career and technical education wings, university buildings, athletic facilities and campus support space for school districts, colleges and university systems across the Panhandle. We recognize that a school job has a fixed finish line, a public funding source, and a community that watches the progress from the street.

This page explains how an education project is built in this market, from bond approval to first bell. It sits beside our education facility construction service page, and it pairs with our government and municipal work, since many school owners follow the same procurement rules.

Amarillo

Growth in the districts and on the campuses

Panhandle school construction has two engines. The first is growing communities. In Dumas, the independent school district spent more than $100 million to open three new elementary schools, and the district is expanding its career and technical education facilities. A business park under development in town is seeking manufacturing and distribution employers, which is the kind of employer that makes a district want more technical training space.

The second is the university. In 2022 the Texas A&M System approved $30 million for an agricultural research and extension center to move about 60 employees to a new building on Russell Long Boulevard at West Texas A&M, next to the Agricultural Sciences Complex. The regents also approved $8.4 million for an athletic expansion. Our work near West Texas A&M University follows these funded projects and the labs, pavilions and event spaces around them.

Amarillo

Building between semesters and bell schedules

A school schedule has hard edges: the first day of classes, the end of the semester, a state testing window and summer. A new elementary school can be built on its own site while the old one operates, which makes it the easier case. A renovation is harder, because rooms must be handed back to teachers and students by a fixed date, and every delay compresses the next phase.

We plan renovations by summer windows. Heavy demolition, roofing, mechanical replacement and floor work happen when students are away, and finish work and punch lists follow. Long-lead items such as roof top units, windows, casework and lab equipment are ordered before the windows open. When the owner needs more time, we phase classroom wings so some stay in use. Our phased construction on occupied sites approach gives teachers a clear map of what is closed and when it returns. For multi-building programs, such as a district rolling out several schools, we use the same planning discipline as our programmatic multi-site rollouts.

Amarillo

Accessibility, fire safety and public procurement

Public school projects register with the state for accessibility review when the cost is $50,000 or more under the 2012 Texas Accessibility Standards. The review is separate from the local building permit and takes time, so we put it in the preconstruction schedule. Inside the city limits of Amarillo, permits go through MGO Connect at Building Safety. The city lists the 2021 Building Code, 2021 Fire Code and 2021 Existing Building Code among its adopted codes, effective January 2024, and the existing building code matters for renovations to older campuses. Special inspectors verify steel, concrete and masonry.

Districts outside the city, or on campuses of state universities, follow their own procurement and approval routes. Public owners often choose construction manager at risk or competitive sealed proposals, and we are comfortable on either. We confirm the electrical code edition with the building authority before design is done, because the city's page mentions both a 2023 and a 2026 National Electrical Code edition. The permitting step that ties this together is covered by our permitting and entitlements service.

Amarillo

Classrooms, labs, gyms and shops

An elementary school is a repeated classroom module with a cafeteria, library and gym. A high school adds science labs, performing arts, athletics and technical education shops, each with a different structural or mechanical need. Career and technical education space is the most demanding: welding bays need exhaust and power, automotive bays need drains and ventilation, and agricultural shops need overhead doors and open floor.

University buildings add research needs. A meat science and innovation center, a veterinary diagnostic laboratory and an agricultural sciences complex sit near the West Texas A&M campus, and their neighbors are labs and pavilions that need clean utility service. A medical office or clinic may also sit on a campus. Gyms and commons have big roofs and tall walls, so we review their bracing and roof attachment against the design wind, because a record 83 mph gust was logged at the Amarillo airport in March 2025. Those same spaces often double as community gathering rooms, so we leave room for acoustic treatment, a stage and the loading doors that a school event needs.

Amarillo

Bond dollars, site conditions and what is left for finishes

School budgets are fixed by the bond or appropriation, so cost control is the main job. The shell and structure are predictable. Site work, utilities, parking and fire lanes are not, and drainage can be the surprise. The city has dealt with playa lakes at capacity, and a school site on a low pocket may need a larger detention area than first planned. Soil conditions also matter: Pullman clay loam moves with moisture, so floors and footings need preparation.

We help districts set realistic budgets by pricing alternates early, such as stronger roofing, different mechanical systems or finish levels, and by showing what each change does to the schedule. Our preconstruction estimating work helps the owner decide what to keep when the bids come in high. Hail is a real risk to school roofs, and the June 2020 storm that triggered more than 500 insurance claims in each of two counties is a reminder to ask about roof design and insurance up front.

Amarillo

Tell us the campus, the bond and the dates

Send the scope, the funding source and the date classes must start. We will return a priced scope, a phasing plan around your calendar and a schedule that shows state review and long-lead items.

Amarillo

Questions Owners Ask

Can you renovate a campus during the school year?

Some work can happen during the year, such as exterior work, isolated rooms and mechanical tie-ins with barriers. Noisy and disruptive tasks are usually scheduled for summer and breaks. We sit down with the principal or department head before the plan is final.

What delivery methods do school owners use?

Public owners commonly use competitive bids, competitive sealed proposals or construction manager at risk. Each fits a different situation. We can advise on which suits your project and funding, and we are comfortable on all of them.

How do you handle state accessibility review?

Projects of $50,000 or more must be registered and reviewed by the state under the Texas Accessibility Standards. The designer submits, and we include the review period in the baseline schedule. Inspections later confirm the work matches the reviewed plans.

What can we do about a tight bond budget?

Price alternates during design, simplify the plan and keep repeatable elements. Early involvement of the builder helps find savings before drawings are finished. We show the cost of each alternate and what it means for the schedule.

Do you build career and technical education space?

Yes. Welding, automotive, agriculture and construction shops need exhaust, power, drains and open floor area. We coordinate with the instructors on equipment layouts before the walls are framed.