General Contracting Services

General Contracting

OVERVIEW

General Contractors of Amarillo plans and manages commercial and industrial construction across Amarillo and the Texas Panhandle, from preconstruction, estimating and permitting through site work, structure and closeout.

Each service below has its own page covering how the work is planned on the high plains: wind, hail and dust, clay and caliche soils, distance to suppliers and the review sequence.

Most

REQUESTED

Start with the pages owners in Amarillo and the Panhandle ask about most often.

  • Commercial Construction in Amarillo and the Texas Panhandle
  • Office Building Construction in Amarillo
  • Retail Shopping Center Construction in Amarillo
  • Mixed-Use Construction in Amarillo
  • Hotel and Hospitality Construction in Amarillo
  • Healthcare Construction in Amarillo
  • Medical Office Construction in Amarillo
  • Restaurant Construction in Amarillo
  • School and Education Construction in Amarillo
  • Municipal and Government Construction in Amarillo
  • Self-Storage Construction in Amarillo
  • Parking Structure Construction in Amarillo
  • Multifamily Apartment Construction in Amarillo
  • Podium and Wrap Construction in Amarillo
  • Senior Living Construction in Amarillo

All

SERVICES

  • Commercial Construction

    Commercial general contracting across Amarillo and the Panhandle, planned around wind, clay soil, caliche and hail before a bid goes out.

    Service
  • Office Building Construction

    Office buildings and professional suites in Amarillo, built around TAS review, Panhandle wind loads and the tenant schedule you actually have.

    Service
  • Retail Shopping Center Construction

    Retail centers, pad sites and strip buildings in Amarillo, planned around hail, Loop 335 access and the opening date your tenants signed.

    Service
  • Mixed-Use Construction

    Mixed-use buildings in Amarillo with shops, offices or hotel space under housing, built with fire separations and phasing worked out early.

    Service
  • Hotel and Hospitality Construction

    Hotels and extended-stay buildings in Amarillo, built to brand standards and planned around I-40 traffic, wind and an opening-day deadline.

    Service
  • Healthcare Construction

    Hospital additions, emergency departments and clinic buildings in Amarillo, delivered with infection control, phasing and state review planned.

    Service
  • Medical Office Construction

    Clinics, specialty offices and surgery-adjacent buildings in Amarillo, built to a physician group schedule with imaging, gas and TAS in mind.

    Service
  • Restaurant Construction

    Restaurants, drive-thrus and bars in Amarillo built with the grease, gas and exhaust sorted early, on pad sites or inside existing space.

    Service
  • Preconstruction and Estimating

    Early budgets, soils review, permit checks and bid packages for Panhandle projects, so the number you plan on is the number that survives the first dig.

    Service
  • Design-Build Delivery

    One contract for design and construction in Amarillo: early budgets, a licensed design team, permit coordination and a fixed price before the first footing.

    Service
  • Construction Management at Risk

    Construction management at risk for Panhandle owners: early pricing, open trade bidding, a guaranteed maximum price and one builder accountable for the result.

    Service
  • Site Development and Utilities

    Grading, drainage, water and sewer, paving and detention for Amarillo and Panhandle sites, built around playa lakes, caliche, clay and county platting rules.

    Service
  • Mass Grading and Earthwork

    Cut, fill, caliche, clay subgrade and dust control for commercial and industrial pads in Amarillo and across the Texas Panhandle, priced from borings.

    Service
  • Stormwater and Drainage Construction

    Storm sewers, detention basins, culverts and outfalls for Amarillo and Panhandle sites, built around playa lakes, slow clay soils and county platting rules.

    Service
  • Concrete Foundations

    Footings, grade beams and slab foundations for commercial and industrial buildings in Amarillo, engineered for expansive clay, wind, heat and hard freezes.

    Service
  • Deep Drilled Pier Foundations

    Drilled shafts for heavy and tall commercial and industrial buildings in Amarillo, built through shallow caliche, expansive clay and playa-edge groundwater.

    Service
Call806-547-1782